Seismic system
Protection through the structure
TRANSRAT coverage uses slabs and structural elements around perimeter routes, plant rooms and utility entrances to deter movement through the building fabric.
View TRANSRAT →
Data centers
Deter rodents around cabling, raised floors and service routes without poison, traps or disruption to uptime-critical operations.
Request a free assessmentCritical infrastructure
Utility entrances, cable pathways and raised floors give rodents direct routes toward infrastructure that cannot tolerate damage or unplanned access.
The protection plan starts outside the white space. It addresses the structural and service routes that connect the perimeter to uptime-critical equipment.
Raised-floor cable route
Coverage map
Each layer is reviewed against security, access and equipment requirements before placement is specified.
Conduits, service penetrations and perimeter access
Generators, switchgear and mechanical infrastructure
Trays, risers and protected distribution routes
Controlled access beneath critical equipment
Uptime protection architecture
Data centers need discreet, non-toxic protection around cable pathways and utility entrances without adding recurring service activity inside secure, uptime-critical spaces.
Seismic system
TRANSRAT coverage uses slabs and structural elements around perimeter routes, plant rooms and utility entrances to deter movement through the building fabric.
View TRANSRAT →
Ultrasonic system
US2004 units can supplement open service and infrastructure areas where airborne coverage is appropriate. Placement and equipment compatibility are reviewed before specification.
View US2004 →Trusted by commercial operators
The plan focuses on preventing access to cabling and infrastructure where a small incident can create disproportionate operational risk.
Site access, installation sequencing and maintenance expectations are defined around the facility’s security procedures.
The system operates without rodenticide or bait near sensitive equipment and controlled infrastructure.
The facility assessment reviews equipment, operating requirements and proposed placement before any ultrasonic component is specified.
The plan considers perimeter access, structural transmission, raised-floor conditions and utility penetrations rather than treating only visible rooms.
Strike System runs continuously and requires little maintenance. The installation plan lists any areas that will need future access.

September 18, 2026
Hours after a routine service visit, a supervisor rounds a live California facility and spots the small signs that always matter more than the paperwork: fresh droppings at a wall line, a…
Read article →
September 15, 2026
The renewal meeting is supposed to be about numbers. Then the conversation widens. Pest spend is up for review just as audit planning tightens, poison policies feel less comfortable than they did…
Read article →
September 15, 2026
The pre-audit review is supposed to be the easy part. The binder is complete, service reports are filed, trend notes are attached, and everyone in the room should feel covered. But then…
Read article →Free site assessment