Seismic system
Protection through the structure
TRANSRAT uses the warehouse structure to extend deterrence through concrete floors, perimeter walls, columns and concealed utility routes across large footprints.
View TRANSRAT →
Warehousing
Protect large footprints, loading operations and concealed travel routes with a system configured for the building rather than individual trap locations.
Request a free assessmentA moving footprint
Dock doors open, pallets move and rack density changes. Rodent pressure follows the gaps between those operations, while scheduled devices remain fixed in place.
Strike System covers the slab, perimeter and open warehouse volume so protection can follow movement instead of a growing map of service points.
Dock line and rack field
Coverage map
System placement follows the operational path from inbound freight to stored inventory.
Receiving doors, levelers and perimeter transitions
High-turnover freight and temporary storage
Changing inventory density and long aisles
Electrical rooms, conduits and concealed runs
Trusted by commercial operators
Warehouse coverage
Warehouses need coverage that scales beyond individual bait and trap points. The system is planned around the slab, perimeter, dock line and open storage volume.
Seismic system
TRANSRAT uses the warehouse structure to extend deterrence through concrete floors, perimeter walls, columns and concealed utility routes across large footprints.
View TRANSRAT →
Ultrasonic system
US2004 units are located for open-air coverage across loading, staging and storage zones, accounting for racking, inventory density and changing layouts.
View US2004 →System quantity and placement are calculated from construction, floor area and known pressure points rather than trap count.
Open-area coverage is planned around racking and material flow so normal stock movement does not undermine the deployment.
Dock doors, receiving lanes and perimeter transitions receive specific attention during the facility review.
TRANSRAT configurations can cover up to 100,000 square feet, while final coverage depends on the building’s construction and layout.
Yes. Racking and inventory can block airborne signals, which is why US2004 placement is planned from the actual layout and may be combined with seismic deterrence.
Work is planned around traffic, loading and restricted areas. The assessment defines a safe installation sequence for the site.

October 3, 2026
Volume forecasts are climbing, trailers will turn faster in a few short weeks, and a warehouse that looks disciplined in every planning meeting still has one stubborn problem near the edge of…
Read article →
September 25, 2026
Receiving is moving the way it always does. Dock doors cycle, inbound pallets turn, and nothing about the floor looks out of line until someone notices fresh evidence tight to the wall…
Read article →
September 18, 2026
Hours after a routine service visit, a supervisor rounds a live California facility and spots the small signs that always matter more than the paperwork: fresh droppings at a wall line, a…
Read article →Free site assessment