Dedicated amplification
Each speaker has its own amplifier. Quantity and placement are planned for the operating area.
Commercial-grade ultrasonic deterrence
Protect open operating areas with continuously changing ultrasonic frequencies. US2004 combines dedicated amplification with planned speaker placement for commercial-scale deterrence.
Request a free assessment
Each speaker has its own amplifier. Quantity and placement are planned for the operating area.
Walls, stored goods, racking and equipment can obstruct airborne signals. Coverage is planned around them.
Some people may hear high-frequency sound. Placement and settings are reviewed for staff and customer areas.
Trusted by commercial operators
Coverage moves through the room
US2004 changes its frequency patterns to help prevent rodents becoming accustomed to the signal. Each speaker has dedicated amplification for the area it protects.
We plan around walls, racking and equipment, which can block airborne sound. Room use and staff sensitivity determine the final placement and settings.
Open storage and operating areas
Layout and equipment quantity are based on the building, access and coverage area.
Room dimensions, equipment, racking and material density are documented before placement.
Emitters are aimed to cover the operating area while accounting for hard surfaces and blocked paths.
Adaptive patterns run continuously to reduce habituation.
Food production, storage zones, service yards and open interior spaces
Strike System installation
Professional installation
Our team reviews your structure, scans fixing points where required and installs discreetly around your operations. A one-time system investment, with no poison, bait or traps to replenish.
Request a free assessmentSome people can hear high-frequency sound. We review occupants, room use and proposed placement before recommending the system.
Yes. Ultrasonic energy travels through open air and can be obstructed, which is why the system is positioned from the actual room layout.
Dedicated amplification, changing frequency patterns and planned speaker placement provide coverage suited to the room layout and its obstructions.

November 4, 2026
On the move plan, mark one production machine in two colors: its old footprint and its new one. At the first location, an unused floor opening may remain when the machine leaves.…
Read article →
November 4, 2026
A maintenance planner pulls a needed spare from its cabinet and spots mouse droppings on the shelf beside it. The scheduled outage has not started, but the part’s availability is now uncertain.…
Read article →
October 3, 2026
Volume forecasts are climbing, trailers will turn faster in a few short weeks, and a warehouse that looks disciplined in every planning meeting still has one stubborn problem near the edge of…
Read article →Free site assessment